Cairo Metro Line 4 – Phase 1 – CP-401

Airports & Transportation

Client: The National Authority for Tunnels (NAT).

Engineer: Nippon Koei Main Contractor : HAC – Arab Contractors – PETROJET - Concord

Location: Cairo, Egypt.

Project Duration: 2021 - 2027.

Scope of work:

  • 12 Metro Stations starting from Hadaek AL Ashgar at 6th October City till El Mesaha Station at Al Haram Street with total length 13.70 km
  • 11 Stations will be Constructed underground using the top-down construction method and connected by 19.60 Km of Double Concrete Tunnels.
  • The scope will include all Civil Works, mechanical, electrical, plumbing, and architectural works.

Project facts:

  • Contract type is re-measured.
  • Engineering & MEP Works on Lump Sum Basis.