Oriana Villas Phase 3

Residential Buildings, Hotels & Mixed-Use Compounds

Client: AL-Futtaim Real Estate for Development

Consultant: Engineering Consultants Group

Location: New Cairo, Egypt

Project duration: 2016 - 2018

Scope of work

  • The project’s construction strategy is organized into four packages (A-D)
  • Package C is for the infrastructure, fences and gates for the whole Oriana phase 3 area
  • Package D is for the construction of 89 villas in zones 5-8

Package (C):

  • Water network: 9,950 Ml of UPVC pipes
  • Sewage network: 7,500 Ml of UPVC pipes
  • Fire fighting network: 9,500 ML of UPVC and HDPE pipes
  • Surace drainage network: 13,000 Ml of HPE perforated pipes
  • Fiber Optic network: 30,700 Ml of HDPE pipes, 12,700 Ml of air blown micro ducts 

Package D:

  • This package includes 89 villas, comprising of 16 villa prototypes
  • The scope of work includes the complete construction on core and shell basis, along with the exterior finishes of villas and fences