Client: AL-Futtaim Real Estate for Development
Consultant: Engineering Consultants Group
Location: New Cairo, Egypt
Project duration: 2016 - 2018
Scope of work
- The project’s construction strategy is organized into four packages (A-D)
- Package C is for the infrastructure, fences and gates for the whole Oriana phase 3 area
- Package D is for the construction of 89 villas in zones 5-8
Package (C):
- Water network: 9,950 Ml of UPVC pipes
- Sewage network: 7,500 Ml of UPVC pipes
- Fire fighting network: 9,500 ML of UPVC and HDPE pipes
- Surace drainage network: 13,000 Ml of HPE perforated pipes
- Fiber Optic network: 30,700 Ml of HDPE pipes, 12,700 Ml of air blown micro ducts
Package D:
- This package includes 89 villas, comprising of 16 villa prototypes
- The scope of work includes the complete construction on core and shell basis, along with the exterior finishes of villas and fences