Lidya Wastewater Treatment Plant

23 December 2022

Hassan Allam Holding is pleased to announce that its subsidiary, Intech, has been awarded an engineering, procurement, and construction contract for the LIDYA wastewater treatment plant in El Behera governorate. The plant has a capacity of 20,000 m3/day and will act as an extension of the LIDYA wastewater treatment plant and will serve more than one hundred and fifty thousand people every day. The plant is designed to operate using an advanced SBR system. The project is in cooperation with the National Authority of Potable Water and Sewage (NOPWASD). Intech has previously delivered a 20,000 m3/day phase of the LIDYA wastewater treatment plant. The project adds to HAH’s longstanding track record of key strategic projects in the water and wastewater treatment sector of more than 14 million m3/day and forms part of the group’s ongoing strategy to contribute to Egypt’s ongoing infrastructure development plans.