Our Support Division located in the 10th of Ramadan City, Egypt, will be powered by solar energy starting August 1st!
As part of our ongoing transformation towards green buildings across all our Group, our Support Division located in the 10th of Ramadan City, Egypt, will be powered by solar energy starting August 1st!
14.07.2024
This project is a continuation to the PV installation initiative, with other key buildings and facilities soon to follow.
The Support Division is the heartbeat of our operations, overseeing everything from Mobilization and Scaffolding to Transportation and Heavy Equipment. Currently, installations of PV plants have started in 3 buildings of the Support Division with a capacity of 131.1 KWp, this initiative will avoid 55 tons of CO2 emissions annually and cover 25% of the buildings’ energy consumption.
These efforts are part of our broader goal to avoid 150 tons of CO2 emissions annually per building, contributing actively to a healthier and safer planet. This launch signifies the initial phase of our green building transformation, as we remain steadfast in our commitment to reducing our environmental footprint.
to learn more about our news.