DRC PV Solar Power Plant

LocationTshipuka, Democratic Republic of Congo
ClientIndustry Promotion Fund (FPI)

Scope of work

Hassan Allam Construction & PGESCO's scope of work includes a 10 MWp photovoltaic power plant, in addition to a 5 MWH energy storage system, is to be built with a substation (SS) and an overhead transmission line (OHTL) at 35 KV over a distance of 23 km, connecting the PV plant substation and the airport substation. Also, a new 35/20 kV substation will be built at the airport.

Project facts

01

10 MWp photovoltaic power plant

02

A new 35/20 kV substation at the Airport

03

5 MWH energy storage system