DRC PV Solar Power Plant
LocationTshipuka, Democratic Republic of Congo
ClientIndustry Promotion Fund (FPI)
Scope of work
Hassan Allam Construction & PGESCO's scope of work includes a 10 MWp photovoltaic power plant, in addition to a 5 MWH energy storage system, is to be built with a substation (SS) and an overhead transmission line (OHTL) at 35 KV over a distance of 23 km, connecting the PV plant substation and the airport substation. Also, a new 35/20 kV substation will be built at the airport.
Project facts
01
10 MWp photovoltaic power plant
02
A new 35/20 kV substation at the Airport
03